Pictures above are on on-going
construction/renovation of the St. Mary's School Chemistry Lab.
Construction/renovaion/ equipment cost is being funded by Dr. and
Mrs. John Alipit.
Construction/Renovation/equipment cost of the Chemistry laboratory
[which includes water sinks, electrical
and gas outlets, exhaust hoods, safety shower, chemicals preparation and storage
room, science tables and stools, two white boards, and two bulletin boards]
is estimated at P400,000.00
See: Science Lab
|