Science Lab
"Aditako Bokodan Di Gawis" = Let Us Share our Blessings"
Website: www.smssfoundation.com


Home
About Us
History
Vision and Mission
5-Year Dev. Plan
Priority Projects
Board and Officers
Contact Persons
Homilies
FAQ
Photo Album
Alumni Page
Favorite Links
Donations Page

Science Laboratory Under Construction
Click on a picture thumbnail to view an enlarged version; then use the back button to view the other pictures.


The construction cost of the St. Mary's School Science Laboratories for Biology, Chemistry and Physics amounting to about P700,000.00 [about US$12,730.00] is being funded by Dr. John and Josephine Alipit.

The construction works was originally scheduled for December 2006 but with the receipt of Dr. and Mrs. John Alipit's donation, construction works started as early as April, 2005.

The construction works include the following:

  1. Renovating the Chemistry laboratory, including water sinks, electrical and gas outlets, exhaust hoods, safety shower, chemicals preparation and storage room, science tables and stools, two white boards, and two bulletin boards. Estimated cots = P400,000.00 
  2. Constructing a Biology laboratory, including sinks and electrical outlets, and furnished with science equipment like microscopes, dissecting kits, science tables and stools, whiteboards and bulletin boards. Estimated cost = P150,000.00
  3. Constructing a Physics laboratory, including electrical equipment and outlets, white boards, and bulletin boards, tables and stools.  The Physics lab will also serve as the shop to be used in TLE (technology and livelihood education) units dealing with applied electricity. Estimated cost = P150,000.00

It maybe mentioned here that Dr. John and Josephine Alipit have also been generous contributors to other SMS projects. See SMSSAFF Treasurer's Updates [click on hyperlink to access]. See in particular
February 18, 2005 Donations Update.

Home ] Up ]